Altigraphs
HC

Yonumaru Jizo Toge-Ikenodaira by Shigeno

South-western ascent from Starting point unknown

Elevation profile

670 m → 2063 m
0–4% 4–6% 6–8% 8–10% 10–14% 14%+
Steepest kilometre: km 6 at 11.8% — peaks at 14.4%
Elevation inside a tunnel is unreliable — the survey reads the mountain above the road, not the road. Report a tunnel

Climb stats

1390 m Ascent
16.06 km Length
8.66% Average
17% Maximum
2063 m Summit altitude
381 Difficulty

Kilometre by kilometre

Export CSV
Km Altitude Gain Average Max Gradient
1 744 m +74 m 7.4% 9%
2 829 m +85 m 8.5% 12%
3 916 m +87 m 8.7% 11%
4 1011 m +95 m 9.5% 12%
5 1096 m +85 m 8.5% 12%
6 1215 m +118 m 11.8% 14%
7 1303 m +89 m 8.9% 15%
8 1396 m +93 m 9.3% 14%
9 1492 m +96 m 9.6% 12%
10 1588 m +96 m 9.6% 14%

Route map

Paved Unpaved Cobblestone Unknown
Report a road type

Photos

No photos yet — be the first to add one.
Add a photo

Rider notes

What it is actually like, from people who have ridden it
Write a note
No rider notes yet — be the first to share what it's really like.

How hard is 381?

Difficulty score is length × gradient, weighted for the steepest kilometre.

Improve this page

Every number here was measured by a rider. If you know this road, correct the data, add a photo, or leave a note for the next person.

Report a tunnel Report a road type
1 contributors History

Conditions at the summit

14°
Partly cloudy · feels like 15°
Wind 6 km/h SW
Updated Just now
Best months to ride
Nobody has voted yet Ridden this one? Tap the months you'd recommend to help other riders time it right.
Tap a month you'd recommend

Climbs nearby